Yakima Building 115 Upgrades
Tenant Improvements
Project Owner: Department of the Interior
USDOI Contract: 140R1019C0021
Location: Bureau of Reclamation, Yakima, WA
Period of Performance: August 02, 2019 – March 30, 2020
Contract Completion: $248,623.97
Project Scope:
-
RJK Construction Managed and Provided All Electrical Engineering, Drawings, Permitting, Labor, Materials, Supplies and Equipment to Add a Breakroom to the Yakima Building 115
-
Primed and Painted First Floor, Basement Level which Included Bathroom Stalls, Stair Doors and Metal Surfaces
-
Disconnected and Reconnected Existing Portable Partitions for the Addition of New Epoxy Flooring
-
Provided All Electrical for the New Basement Breakroom, Wall, and Modified Ceiling
-
Added Light Switching, Relocated Lights and Added Additional Lights
-
Provided Glazing to Include Both Sliding and Picture Windows, Installed Ceramic Wall Tile, Tile Flooring and Tile Carpeting
-
Matched Existing Bricks for the New Wall
-
Installed Upper and Lower Oak Cabinets with Stained/Finished Raised Doors and Laminate Interiors
-
Installed Laminate Countertops
-
Interfaced with the Bureau of Reclamation and Various Subcontractors to Successfully Complete this Project