VFB DCAA Office Upgrade
Tenant Improvements
Project Owner: General Services Administration
GSA Contract: 47PL0121F0087
Location: Vancouver Federal Building, Vancouver, WA
Period of Performance: June 23, 2021 – March 31, 2022
Contract Completion: $243,426.81
Project Scope:
-
RJK Construction Managed and Provided AllLabor, Materials, Supplies, and Equipment,IncludingAll Mechanical, Plumbing and ElectricalWork to Reconfigure, Refresh and Provide Tenant Improvements at the DCAA’s Officeat the VancouverFederal Building
-
Provided a Pre-Demolition Asbestos Survey and Asbestos Abatement
-
Removed and Disposed of Approximately 1,000 SF of Carpet Tiles, Carpet Glue and Asbestos Containing Residual Black Mastic on ConcreteSubstrate
-
Removed andDisposed of 12 LF of Asbestos Containing Pipe Insulation and Mudded Pipe Joints
-
Provided OSHA Compliant Air Monitoring, Pre-Air Balancing, Disconnected and Modified Troffer Diffusers, Insulated New Supply Ductwork
-
Installed New ½ Ton Split System
-
Provided Power for All Newly Installed Break Room Sink, Under Cabinet Lift Station, Pressurized Waste Piping with Water Piping, Under Cabinet Water Heaters and a Refrigerator Water/Ice Maker Connection
-
Removed and Disposed of Existing Light Fixtures, Unused Conduit and Conductors
-
Installed New LED Troffers, Battery-Backed Emergency Lights, (5) Dedicated 20A 120V Circuits, Dedicated Double-Duplex Receptacle for Server Rack, Data Stubs for System Furniture, Data Drop at Team Table, Recessed TV Outlet for Wall
