Visitor Center Replacement of Door Actuators
Tenant Improvements
Project Owner: US Army Corps of Engineers
USACE Contract: W9127N21P0043
Location: Bonneville Lock and Dam, Cascade Locks, OR
Period of Performance: April 29, 2021, through August 23, 2021
Contract Completion: $78,087.45
Project Scope:
- RJK Construction Managed and Provided All Permitting, Labor, Materials, Supplies, and Equipment for the Replacement of Door Actuators at the Bonneville Lock and Dam
- Provided and Installed (9) Tormax 1301 Simultaneous Pair for Touch-Free Operation
- Installed Hands-Free Wireless Activation Switches
- Installed Bollard for Mounting Activation Switch
- Interfaced with USACE and Subcontractors to Successfully Complete this Project and Worked through Volatile Supply Chain Issues Caused by the COVID-19 Global Pandemic
![RJK-Client-US-Army-Corps RJK-Client-US-Army-Corps](https://www.rjkconstruction.biz/wp-content/uploads/2020/05/RJK-Client-US-Army-Corps-300x184.jpg)